As a software project manager, understanding risk and having risk mitigation plans to fall back on is extremely important to me. If someone said to me, "There's a 99% chance that we'll get this software complete by the deadline, but a 1% chance that, if we blow it, we'll lose our funding," I'm going to ask, "Okay, how to we manage that 1% risk? What are the warning signs, what do we do to prevent it, and if we happen to miss the deadline, what can we do so we don't lose our funding?"
Risk is a part of every project, and it must be recognized. Some semblance of an effective risk mitigation plan must exist.
Now, on to the oil crisis in the Gulf of Mexico.
"There's a 99% chance that our oil operation in the Gulf will go off without a hitch, but there's a 1% chance that if something goes catastrophically wrong, we'll fuck up the entire Gulf with thousands of barrels of oil a day spewing out of a hole that could take months to close up, followed by decades of clean-up. It will severely alter the ecology of the area, and it will affect the livelihood of thousands of residents."
I'm going to ask to see your risk mitigation plan. And if it's not good enough, you're going to make it better.
It looks like there was no risk mitigation plan in the first place.
Nice job, guys. Way to be responsible. No triple bottom line for you, huh?
Risk is a part of every project, and it must be recognized. Some semblance of an effective risk mitigation plan must exist.
Now, on to the oil crisis in the Gulf of Mexico.
"There's a 99% chance that our oil operation in the Gulf will go off without a hitch, but there's a 1% chance that if something goes catastrophically wrong, we'll fuck up the entire Gulf with thousands of barrels of oil a day spewing out of a hole that could take months to close up, followed by decades of clean-up. It will severely alter the ecology of the area, and it will affect the livelihood of thousands of residents."
I'm going to ask to see your risk mitigation plan. And if it's not good enough, you're going to make it better.
It looks like there was no risk mitigation plan in the first place.
Nice job, guys. Way to be responsible. No triple bottom line for you, huh?
Subscribe to:
Post Comments (Atom)
Swami Vivekanand University in Sagar
Swami Vivekanand University was established by the Act of Madhya Pradesh State Legislature and notified in its Official Gazette as The Madhya Pradesh Niji Vishwavidyalaya (Staphana Avam Sanchalan) Tritiya Sansodhan Adhiniyam (Act No.44 of 2011- 31 December 2011), after obtaining the assent of his Excellency the Governor of Madhya Pradesh who is the Visitor of the University.
SVN University is managaed by Prakhar Pragya Shiksha Prasar Avam Samaj Kalayn Samiti, Sagar, Madhya Pradesh (INDIA). It is spread over about 65 acres lush green land situated in pollution free, healthy and natural environment.
Provide quality education and develop skills with very nominal Swami Vivekanand University Sagar Fees amongst students of all disciplinary subjects, inculcating appropriate attitudes, behaviors and technical and non technical competence. Promote industry-oriented and socially relevant research projects in Engineering, Science and Technology, in partnership with corporate companies.
Excellent your post. I reaching daily on your blogs. Thanks for sharing this informative information. DUI en Virginia
The way this article tackles such a challenging topic with such clarity is impressive. The writer has done a fantastic job of making everything so easy to follow. I’m grateful for the effort that went into making it accessible to everyone. Huge kudos! Visit our link for ISO Certification in Saudi Arabia